March 1st, 2008
Inspection Plates

I made all six inspection covers today. I had to drill and dimple them all for #6 and #8 screws.

image

I made sure to countersink the right side of the spar for the K1000-4 nutplates. The flush sides go on the rear of the spar. Look at the plans!

image

I had no problem reaching these rivets with my 3 inch yoke.

image

 

 

PreviousConstruction LogTopNext